Constructing HADES

Can we build a repository in poorly indurated clay at a depth of several hundreds of meters? This question was what the pioneers of HADES set out to answer in 1980. HADES was constructed in different phases over the course of 27 years. Discover the different techniques that were used over the years and how this is crucial input for the concept of a final geological disposal repository.

layout HADES

The excavation of HADES was done in two phases. This video gives a general overview of how this was tackled.

Maintenance of HADES

After construction, HADES also has to be maintained for many decades. To do this, it is important to renovate outdated installations, which is exactly what was done to the hoisting installation of shaft 1. 

RReennoovvaattiinngg  tthhee  sshhaafftt

Inspection of gallery linings

HADES is excavated in a poorly indurated clay, which means this is a soft clay. The clay needs a structural support for the galleries to remain in place. In HADES, this was done initially with cast iron, but over time a switch was made to concrete, which is much cheaper and easier to work with. This concrete lining, in the test drift, the access shafts, the connecting gallery and the PRACLAY gallery, need to be assessed for their structural integrity. 

GGaalllleerryy  iinnssppeeccttiioonn